Shenzhen Factory Tour & Audit Prep
Verify genuine SMT/CNC factories before sending files.
Why hardware teams still fly to Shenzhen in 2026: compressing three weeks of overseas email back-and-forth into a 72-hour physical iteration cycle.
Standard 2–4 layer bare PCBs fabricate in 24–48 hours; SLA/SLS 3D-printed shells deliver to your Futian hotel in 12–24 hours; 5-axis CNC aluminum housings take 2–4 days in Dongguan/Bao'an. Bring finalized Gerber, BOM, and STEP files before landing so orders enter production on Day 1.
| Process | Typical Shenzhen Turnaround | Files Required | Common Mistake to Avoid |
|---|---|---|---|
| 2–4 Layer PCB Fab | 24–48 hours | Gerbers + Drill + Stackup | Using obscure non-standard impedance or rare laminate stock during a 3-day trip. |
| Small-Batch PCBA (5–50 pcs) | 2–4 days | BOM + CPL (Pick & Place) | Specifying long-lead Western ICs instead of checking SEG Plaza / LCSC local stock first. |
| SLA / MJF 3D Printing | 12–24 hours | STEP or high-res STL | Forgetting clearance tolerances (+0.2 mm) for snap-fits and USB-C cutouts. |
| CNC Aluminum Housing | 2–4 days | STEP + 2D tolerance PDF | Omitting thread callouts, anodizing color sample, and cosmetic surface flags. |
Add pre-trip BOM screening and 3-factory NDA shortlisting (+$190) to your 2-day Shenzhen itinerary so prototypes are ready when you land.
Calculate 2-Day + BOM Shortlist Quote →